The zoning adminstrator, at the 6/27 hearing, gave the developer an option to make certain revisions to their plans, as he appeared to be leaning toward denying the proposal as currently designed.
This project would replace the Sizzler at 1962 West El Camino and would include a drive-through addition. Please consider speaking out against this project's including a drive through, as we already have 26 drive-through businesses in our city (https://maps.google.com/maps/ms?msid=215093886093862439511.0004bdab6239ffc3d2a63&msa=0), and adding more would be inconsistent with our vision for Mountain View, the 2030 General Plan, Grand Boulevard and Bus Rapid Transit principles.